6 mile (kurrama)

Rapid Deployment of a 91-Person Fully Equipped Modular Workforce Camp

A self-sufficient, transportable workforce camp designed for rapid installation, scalability, and seamless integration into mining operations.

Project Overview

To support the growing client workforce at the nearby minesite, Rapid Camps was engaged to design, supply, and install a 56-person modular workforce camp. During the construction phase the camp scope of work was then expanded to 91-person camp with expanded central facilities. The project required a fully serviced, self-sufficient accommodation solution that provided comfort, efficiency, and scalability in a remote environment.

The primary challenge was ensuring rapid deployment in a remote location and tight project timeline, Rapid Camps implemented a modular, plug-and-play design, allowing for quick installation and immediate usability. The secondayr challenge was expanding the camp during the initial construction phase. The camp included accommodation units, central facilities, and essential services, ensuring that workers had a comfortable and functional living space to support operational efficiency.

The project scope featured 91 fully equipped accommodation units, a robust power infrastructure with three generators and an SMDB (Sub Main Distribution Board) for stable energy distribution, and a scalable design to accommodate future workforce growth. This approach allowed operations to be expanded as needed while maintaining high standards of safety, comfort, and efficiency.

Delivered on time and within budget, the 6 Mile Camp provided a high quality solution for remote long-term workforce housing. The modular design ensures flexibility for future expansions, while the integrated utilities and support infrastructure enhance worker well-being and site efficiency. Rapid Camps continues to deliver turnkey accommodation solutions, ensuring seamless project execution and operational success for clients in remote locations."
Key Deliverables
91-Person Workforce Camp
Fully equipped with essential accommodation and central facilities.
Power Infrastructure
3x generators and 1x SMDB for stable and efficient power supply.
Modular & Scalable Design
Allowing for future expansion based on workforce demands.
Challenges and Solutions
Challenges
The project required rapid deployment in close proximity to mining operations to support an increasing workforce.
Solutions
Rapid Camps provided a turnkey solution, ensuring a seamless setup, reliable power distribution, and scalable infrastructure to accommodate evolving operational needs.
Results and Impact
Results
The camp was delivered on time and within budget, ensuring uninterrupted operations for  the sites workforce.
Impact
The modular setup allowed for efficient site management and long-term adaptability, supporting the client's project expansion strategy.
Portable camp outdoor space with tables and shade structure between container units
Aerial view of a remote mining camp with portable accommodation and site facilities.
Interior of mining camp gym with strength training equipment and treadmills
Indoor gym featuring weightlifting equipment, benches, and exercise machines
Portable accommodation units at a remote mining camp site.
Remote mining camp dining facility with outdoor seating and portable container building.
Exterior of modular portable accommodation building for mining or construction camp
Portable accommodation room with bed, desk, air conditioning, and wardrobe
Shower and sink inside portable accommodation unit for mining or construction camp bathroom facility
Interior of portable accommodation room with bed, TV, wardrobe, and mini fridge
Modern commercial dining area with buffet counter, seating tables, and contemporary lighting.
A row of mobile accommodation with a visible service area
Compact bathroom with toilet and sink inside modular accommodation unit
Exterior of portable accommodation units with individual rooms for mining or construction camp
Single bed setup inside modular accommodation unit with fridge and storage
Compact shower room with sink inside modular accommodation unit for remote workforce
Commercial kitchen inside modular mining camp with stainless steel equipment and food prep area
Compact bathroom with toilet and sink inside portable accommodation unit at remote camp
Generator units and water storage tanks connected with piping system at remote mining camp
Large water storage tanks with connected piping system supplying water at a remote mining or construction camp
Portable camp dining hall with tables and chairs in modular building
Mining camp mess hall with commercial kitchen and dining area in modular camp facility

Location

Enquire Now

Contact Form
Rapid Camps white logo

Rapid Camps delivers high-quality workforce accommodation, infrastructure, and camp services, ensuring efficient, reliable, and scalable solutions for remote projects.

Connect With Us
35/2 Doepel Street, North Fremantle, WA, 6159+61 447 417 466info@rapidcamps.com.au
accreditation
ICN company logo

Copyright © 2025 Rapid Camps. All Rights Reserved.

Privacy PolicyTerms & Condition
Rapid Camps logo in white text

Rapid Camps delivers high-quality workforce accommodation, infrastructure, and camp services, ensuring efficient, reliable, and scalable solutions for remote projects.

accreditation
ICN company logo

Copyright © 2025 Rapid Camps. All Rights Reserved.

Rapid Camps white logo

Rapid Camps delivers high-quality workforce accommodation, infrastructure, and camp services, ensuring efficient, reliable, and scalable solutions for remote projects.

Connect With Us
35/2 Doepel Street, North Fremantle, WA, 6159+61 447 417 466info@rapidcamps.com.au
accreditation
ICN company logo

Copyright © 2025 Rapid Camps. All Rights Reserved!

Terms & Condition